Skip to search form
Skip to main content
Skip to account menu
Semantic Scholar
Semantic Scholar's Logo
Search 230,869,415 papers from all fields of science
Search
Sign In
Create Free Account
Engineering change order
Known as:
Eco
Engineering change orders (ECO) are used for changes in components, assemblies, or documents such as processes and work instructions. They may also…
Expand
Wikipedia
(opens in a new tab)
Create Alert
Alert
Related topics
Related topics
7 relations
Design Automation Conference
Electronic design automation
Formal equivalence checking
Logic synthesis
Expand
Papers overview
Semantic Scholar uses AI to extract papers important to this topic.
2017
2017
Engineering Change Orders and their Impact on DoD Acquisition Contracts
Ian S. Cordell
2017
Corpus ID: 86607156
............................................................................................................................. iv…
Expand
Review
2012
Review
2012
Measuring and improving the process of engineering change orders in a model-based definition context
Virgilio Quintana
,
L. Rivest
,
R. Pellerin
2012
Corpus ID: 56594197
The model-based definition (MBD) approach represents a trend in computer-aided design (CAD) that promises reduced time-to-market…
Expand
2009
2009
New spare cell design for IR drop minimization in Engineering Change Order
Hsien-Te Chen
,
Chieh-Chun Chang
,
TingTing Hwang
46th ACM/IEEE Design Automation Conference
2009
Corpus ID: 16998685
Unused spare cells occur inevitably in traditional ECO design flow. It results in inefficient area usage, more leakage, and more…
Expand
2005
2005
An Engineering Change Orders Design Method Based on Patchwork-Like Partitioning for High Performance LSIs
Yuichi Nakamura
,
Ko Yoshikawa
,
T. Yoshimura
IEICE Transactions on Fundamentals of Electronics…
2005
Corpus ID: 5574538
This paper describes a novel engineering change order (ECO) design method for large-scale, high performance LSIs, based on a…
Expand
2004
2004
Automated Custom Physical Design ( ACPD ) Flow In CADENCE IC 5 . 0 . x For Mixed-Signal Designs
J. Premkumar
2004
Corpus ID: 14872745
The ACPD flow is vital for accelerated mixed-signal layout design. This paper will provide the flow details, tools, and the steps…
Expand
2001
2001
An algorithm for simultaneous pin assignment and routing
Hua Xiang
,
Xiaoping Tang
,
D. F. Wong
IEEE/ACM International Conference on Computer…
2001
Corpus ID: 3524873
Macro-block pin assignment and routing are important tasks in physical design planning. Existing algorithms for these problems…
Expand
2001
2001
COMPUTER AIDED DETECTION OF COMPONENT INTERFERENCE
F. Boór
,
Lajos Kutrovácz
,
Balázs Mikó
,
Imre Szegh
2001
Corpus ID: 18317313
The demand of the dynamic global market for higher quality and lower cost products with shorter development lead-time has forced…
Expand
1997
1997
Regular datapaths on field programmable gate arrays
A. Koch
1997
Corpus ID: 45354245
Field-Programmable Gate Arrays (FPGAs) are a recent kind of programmable logic device. They allow the implementation of…
Expand
1993
1993
Recommendation for an interface system for product related computer data to enhance the Engineering Change Order/Preliminary Change Order function
Patrick B. McPhee
1993
Corpus ID: 107136534
The following document will explore product and information integration by demonstrating the potential economic, strategic, and…
Expand
1991
1991
The DECconcentrator 500 Project
W. J. Tiffany
,
G. P. Koning
,
James E. Kuenzel
Digital technical journal of Digital Equipment…
1991
Corpus ID: 5154876
Interconnect (CI) bus. All Digital's decision stations were to be dual to implement the fiber attachment stations (DASs…
Expand
By clicking accept or continuing to use the site, you agree to the terms outlined in our
Privacy Policy
(opens in a new tab)
,
Terms of Service
(opens in a new tab)
, and
Dataset License
(opens in a new tab)
ACCEPT & CONTINUE
or Only Accept Required