Skip to search formSkip to main content
You are currently offline. Some features of the site may not work correctly.

Early completion

Early completion is a property of some classes of asynchronous circuit. It means that the output of a circuit may be available as soon as sufficient… Expand
Wikipedia

Papers overview

Semantic Scholar uses AI to extract papers important to this topic.
2017
2017
In this letter, we consider a cooperative sharing model for cognitive wireless powered communication networks (CWPCNs), which… Expand
  • figure 1
  • figure 2
  • figure 4
2015
2015
Studies of annual and geographic variation in eusocial bee populations suggest that more stringent environmental conditions… Expand
  • table 1
  • figure 1
  • table 2
  • figure 2
  • figure 3
2015
2015
In this paper we propose an incentive payment contract for stochastic projects defined by a series of stages or tasks that are… Expand
  • table 1
  • table 2
  • figure 1
  • figure 2
2014
2014
AbstractIncentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of… Expand
2011
2011
F.Shirvani M.sc. in Civil Engineering Construction and Project Management Islamic Azad University Shoushtar Branch ,Tehran, Iran… Expand
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 5
2011
2011
We consider an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) to multi-level (or multi-mode) activities… Expand
  • figure 1
  • figure 2
  • table 1
  • table 3
2008
2008
This paper presents a design methodology incorporating multi-threshold CMOS (MTCMOS) into delay-insensitive asynchronous circuits… Expand
  • figure 1
  • figure 3
  • table 1
  • figure 4
  • figure 6
2007
2007
Dynamic voltage scaling (DVS) has been adopted in many computing systems to reduce the energy consumption of the processor by… Expand
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 5
2004
2004
  • M. S.
  • 2004
  • Corpus ID: 14562376
A new general method for designing asynchronous datapath components, called speculative completion, is introduced. The method has… Expand
  • figure 2
  • figure 1
  • figure 4
  • figure 5
  • table 1
2002
2002
  • S. Smith
  • Proceedings IEEE Computer Society Annual…
  • 2002
  • Corpus ID: 2882270
An Early Completion technique is developed to significantly increase the throughput of NULL Convention self-timed digital systems… Expand
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 5