Skip to search formSkip to main contentSkip to account menu

Work breakdown structure

Known as: Work Breakdown Structure Chart, Work package, WBS 
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented decomposition of a project into smaller… 
Wikipedia (opens in a new tab)

Papers overview

Semantic Scholar uses AI to extract papers important to this topic.
2011
2011
The basic principle of waveband switching (WBS) is to group multiple wavelengths together as a band or fiber and switch the group… 
2009
2009
The knowledge of the stress-strain relationships of structural steel at elevated temperatures is essential for the assessment of… 
2007
2007
Waveband switching (WBS) in conjunction with multigranular optical cross-connect (MG-OXC) architectures can reduce the cost and… 
Review
2005
Review
2005
PurposeThe motivation for this investigation is to apply social networking features to a semantic network portal, which supports… 
2004
2004
SummaryEmbryo-rescue was studied as a means to overcome post-fertilization barriers in interspecific crosses in the genus Tulipa… 
2003
2003
Wavelength band switching (WBS) has only recently attracted attention from the optical networking industry for its practical… 
2002
2002
Modified-atmosphere (MA) packaging using bag-in-box Xtend® liners extended the postharvest life of nonnetted Charentais-type… 
Review
1999
Review
1999
This DISC Working Paper D3.8a presents an overview of, and a reading guide to, the DISC work package 2 and work package 3… 
1999
1999
A mobile agent based framework for the transparent distribution and concurrent execution of computations is presented. The… 
1959
1959
mixtrirc was nearly clear at this time. A slight vacuum was applied to remove hydrogon chloride and the rcsuking solution of the…