Skip to search form
Skip to main content
Skip to account menu
Semantic Scholar
Semantic Scholar's Logo
Search 235,737,710 papers from all fields of science
Search
Sign In
Create Free Account
Integrated master plan
Known as:
IMP
, IMS
, Integrated Master Schedule
In the United States Department of Defense, the Integrated Master Plan (IMP) and the Integrated Master Schedule (IMS) are important program…
Expand
Wikipedia
(opens in a new tab)
Create Alert
Alert
Related topics
Related topics
5 relations
Critical path method
Risk management
Statement of work
Work breakdown structure
Broader (1)
Systems engineering
Papers overview
Semantic Scholar uses AI to extract papers important to this topic.
2017
2017
A Study on NPP Construction Activity Numbering System for Level IV Integrated Master Schedule
C.H. Kwon
,
M. Roh
2017
Corpus ID: 108323405
The Advanced Pressurized Reactor-1400 (APR1400) Nuclear Power Plant (NPP) construction projects have a schedule hierarchy of…
Expand
2014
2014
IDC Integrated Master Plan.
David J. Clifford
,
James M. Harris
2014
Corpus ID: 112010667
This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned…
Expand
2012
2012
Unleashing the Predictive Power of the Integrated Master Schedule: The Planning and Scheduling Excellence Guide (PASEG)
Joshua Anderson
,
J. Upton
2012
Corpus ID: 114341717
Abstract : We are gravely underutilizing one of the most powerful predictive weapons in our program management arsenal. The…
Expand
Review
2010
Review
2010
Integrated Master Plan Analysis: The PMAG Approach
M. Kwon
2010
Corpus ID: 113567667
Abstract : It has been widely recognized that there is room for improvement in the Department of Defenses program management…
Expand
2010
2010
Acquisition of impersonal constructions in L2 Russian.
O. Kudeykina
2010
Corpus ID: 63240867
In this study I want to investigate and analyze the process of acquisition of L2 Russian on the example of the acquisition of…
Expand
Review
2010
Review
2010
Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office
Bryan Barley
,
P. Gilbert
,
M. Newhouse
2010
Corpus ID: 106970702
The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays…
Expand
2009
2009
Applying Risk Management to Reduce The Overall Time In Lay-Up While Increasing the Cost Effectiveness of a Nimitz (CVN 68) Class Aircraft Carrier in Dry Dock During the Execution Phase of a Refueling…
Kiah Bernard Rahming
2009
Corpus ID: 108660850
Abstract : The Refueling and Complex Overhaul (RCOH) of an aircraft carrier is one of the most important milestones in a carrier…
Expand
2005
2005
Controlled Public Transport Fares in the Developing World: Help or Hindrance to the Urban Poor?
John E. Thompson
,
K. Nagayama
2005
Corpus ID: 18276650
Transportation is an important element in combating urban poverty in developing countries. This article draws data from an…
Expand
2002
2002
UCMEXUS FINAL PROJECT REPORT Collaborative Environmental Chamber and Modeling Studies for Evaluating Effects of Emissions on Air Quality in Mexico City June 27
Rafael Villaseñor-Gutiérrez
,
Julio Sandoval-Fernández
,
+10 authors
Bo Wang
2002
Corpus ID: 361446
CERT) and the Mexican Petroleum Institute (IMP) have been carried out. The areas of collaboration were in air quality modeling…
Expand
1999
1999
Using Contractor Capability Evaluations to Reduce Software Development Risk
B. Troup
,
B. Gallagher
1999
Corpus ID: 151216
ware acquisition professionals, and the increased commitment of maturing acquisition organizations to deliver promised software…
Expand