Facility Contact Backup

The secondary contact person at a facility.
National Institutes of Health

Topic mentions per year

Topic mentions per year

1982-2017
01219822017

Papers overview

Semantic Scholar uses AI to extract papers important to this topic.
2014
2014
Long-reach passive optical networks (LR-PONs) prove to be a suitable candidate for future broadband access networks. The longer… (More)
  • figure 2
  • figure 1
  • figure 3
  • figure 4
  • figure 5
Is this relevant?
2014
2014
Backbone networks usually have some excess capacity (EC) to accommodate traffic fluctuations and to avoid early capacity… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 5
Is this relevant?
2013
2013
Maximizing connection availability in wavelength division multiplexing (WDM) networks is critical because even small disruptions… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 6
  • figure 5
Is this relevant?
2013
2013
In multiprocessor systems, redundant scheduling is a technique that trades processing power for increased reliability. One… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 7
Is this relevant?
2011
2011
Mixed-line-rate (MLR) networks have been proposed recently to support emerging traffic demands with diverse capacity requirements… (More)
  • figure 1
  • figure 4
  • figure 3
  • figure 5
  • figure 2
Is this relevant?
2009
2009
This paper investigates practical cost-effective DC/DC converter, DC/AC inverter and AC/DC rectifier for an uninterruptible power… (More)
  • figure 1
  • figure 2
  • figure 4
  • figure 5
  • figure 6
Is this relevant?
2008
2008
With multiprocessor systems, redundant scheduling is a technique that trades processing power for increased reliability through… (More)
Is this relevant?
2007
2007
In multiprocessor systems, redundant scheduling is a technique that trades processing power for increased reliability. One… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 7
Is this relevant?
2001
2001
In real-time systems, tasks have deadlines to be met despite the presence of faults. Primary-Backup (PB) scheme is one of the… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 4
  • figure 5
Is this relevant?
1982
1982
Thirty white mentally retarded children were administered the WISC-R under one of three conditions: standardized testing… (More)
Is this relevant?