Skip to search formSkip to main contentSkip to account menu

Flow shop scheduling

Known as: Flow Shop Scheduling Problem, Flow Shop Scheduling problems 
Flow shop scheduling problems, are a class of scheduling problems with a workshop or group shop in which the flow control shall enable an appropriate… 
Wikipedia (opens in a new tab)

Papers overview

Semantic Scholar uses AI to extract papers important to this topic.
2016
2016
The permutation flow-shop scheduling problem (PFSP) is a typical combinational and non-deterministic polynomial-hard problem… 
2012
2012
Flowshop Scheduling is used to determine the optimal sequence of n jobs to be processed on m machines in the same order… 
2010
2010
Flow shop assembly production system is a system that combines different manufactur ing operat ions independently and… 
2010
2010
In a shop floor of the industry, the routings which are based upon the jobs that need to be processed on different machines are… 
2008
2008
Production planning and scheduling play significant roles in manufacturing system operations and different techniques have been… 
2005
2005
Different flow shops have different production ways.In order to improve scheduling problems caused by various production ways of… 
2004
2004
The classical problem of scheduling n jobs on m machines in a flow shop is to minimize the throughput time of all the jobs under… 
2002
2002
This paper first formulates the hybrid flow shop scheduling (HFSS) problem using an integer programming model and then develops a… 
1999
1999
Shop scheduling problems are known to be notoriously intractable, both in theory and practice. In this paper we give a randomized… 
1970
1970
Abstract This article is concerned with the solution of the flow shop scheduling problem in which all jobs have the same machine…