Warnier/Orr diagram

Known as: Warnier orr diagrams, Brace map, Warnier/Orr 
A Warnier/Orr diagram (also known as a logical construction of a program/system) is a kind of hierarchical flowchart that allows the description of… (More)
Wikipedia

Topic mentions per year

Topic mentions per year

1982-2015
01219822015

Papers overview

Semantic Scholar uses AI to extract papers important to this topic.
2015
2015
Software engineering has come to the stage where speed of development, level of correctness, interoperability, user friendliness… (More)
  • figure 1
  • figure 2
  • figure 3
  • figure 3
  • figure 4
Is this relevant?
2010
2010
In this paper, a GSM based cellular communication scheme with encompassing security is proposed for electronic banking. In order… (More)
  • figure 1
Is this relevant?
Review
2003
Review
2003
  • Carol A. Ziegler
  • 2003
The strong feature of C. A. Ziegler's book is its breadth of coverage. The topics discussed go from system design to… (More)
Is this relevant?
1988
1988
While validation of user requirements has become an important goal for information system designers, very little empirical… (More)
  • table I
Is this relevant?
Review
1988
Review
1988
Graphical representations for algorithms (GRA's) have been available to practitioners as software comprehension aids since the… (More)
Is this relevant?
1988
1988
Problems involving Ada tasking can be difficult to specify because there are few existing methods for visualizing them. Currently… (More)
Is this relevant?
1985
1985
The introductory computer science course often plays a dual role in the resource limited environment of a small liberal arts… (More)
Is this relevant?
Review
1984
Review
1984
The Ken Orr seminar dealing with Structured Requirements Definition is one which strives to teach the participan t a unique way… (More)
Is this relevant?
Review
1984
Review
1984
The Ken Orr seminar dealing with Structured Requirements Definition is one which strives to teach the participan t a unique way… (More)
Is this relevant?
Review
1982
Review
1982
tors design will require a "minimum of two percent of th e total program cost ." This is a small price to pay if the process… (More)
Is this relevant?