Yearly Maintenance Scheduling of Transmission Lines Within a Market Environment

@article{Pandzic2012YearlyMS,
  title={Yearly Maintenance Scheduling of Transmission Lines Within a Market Environment},
  author={Hrvoje Pandzic and A. J. Conejo and Igor Kuzle and Eduardo Caro},
  journal={IEEE Transactions on Power Systems},
  year={2012},
  volume={27},
  pages={407-415}
}
Within a yearly horizon, a transmission system operator needs to schedule the maintenance outages of the set of transmission lines due for maintenance. Facing this task, two conflicting objectives arise: on one hand, the transmission system adequacy should be preserved as much as possible, and, on the other hand, market operation should be altered in the least possible manner. To address this scheduling problem, a bilevel model is proposed whose upper-level problem schedules line maintenance… CONTINUE READING
Highly Cited
This paper has 21 citations. REVIEW CITATIONS