Use of inverse method for bonding quality assessment between bitumen and aggregates under asphalt mixes manufacturing conditions

  • Sâannibè-Ciryle Somé
  • Published 2013


In roads building, classical asphalt mix manufacturing commonly requires the heating (at 160°C) and the complete drying of aggregates. The induced energy cost has opened the way to develop alternatives processes and materials with low energy/carbon materials such as Warm Mix Asphalt (WMA). In warm mixes processes, aggregates manufacturing temperatures are… (More)


12 Figures and Tables