Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence

Abstract

This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time… (More)
DOI: 10.1057/jors.2011.90

7 Figures and Tables

Topics

  • Presentations referencing similar topics