Two machine Flow shop with transportation time

Abstract

We present a scheduling problem of the flow-shop type. We introduce a transportation system: robot or conveyor. This transportation system is also involved in machine loading and unloading. The studied workshop consists of two machines and a conveyor that must process a set of tasks. Tasks having just been executed wait for the conveyor to be transported… (More)

13 Figures and Tables

Topics

  • Presentations referencing similar topics