Corpus ID: 51775574

TruePlanning Guidance for Modeling ARP-4754 , DO-254 and DO-178 b / c

@inproceedings{2015TruePlanningGF,
  title={TruePlanning Guidance for Modeling ARP-4754 , DO-254 and DO-178 b / c},
  author={},
  year={2015}
}
  • Published 2015
  • DO-178b/c and DO-254 each contain a set of objectives that must be met. These objectives define the level of verification and validation required at each Design Assurance Level. Figure 2 shows the number of objectives for each certification. In addition to these objectives, DO-254 section 2.3.4 and Appendix B also have additional considerations for Levels A/B electronics [2]. This information should give a sense of the relative scope for each of the 5 levels of certification. 

    Figures from this paper

    References

    SHOWING 1-7 OF 7 REFERENCES
    DO-254 Effort Estimator release version 1b. Obtained by request from http://logicircuit.com/resources
    • Retrieved September
    • 2014
    Certification Cost Estimates for Future Communication Radio Platforms.
    • https://www.eurocontrol.int/sites/default/files/content/documents/communications/29012009certification-cost-estimation-for-fci-platform.pdf.pdf. January
    • 2009
    DO-178B Costs Versus Benefits.
    • Retrieved December
    • 2014
    Estimating the effort and cost of a DO-254 program.
    • Logicircuit, Inc. http://www.intelligent-aerospace.com/articles/2014/02/estimating-do-254.html. February
    • 2014
    Merging Safety and Assurance: The Process of Dual Certification for FAA and the Common Criteria
    • http://cps-vo.org/file/1612/download/36738. Retrieved December
    • 2014
    Avionics Certification: A Complete Guide to DO-178 (Software), DO-254 (Hardware)
    • 60
    Isolating Safety.
    • Aviation Week & Space Technology Magazine. July
    • 2005