Traditionally, manufacturing companies have controlled their parts through the reorder point (ROP) technique

Abstract

A material requirement planning is a technique that uses the bill of material, inventory data and a master schedule to calculate requirements for material. It also takes into account the combination of the bill of material structure and assembly lead times. The result of an MRP plan is a material plan for each item found in the bill of material structure… (More)

Topics

6 Figures and Tables

Slides referencing similar topics