Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
@article{Bri2018TrackingPG, title={Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling}, author={Mario Br{\vc}i{\vc} and Danijel Mlinari{\'c}}, journal={Journal of information and organizational sciences}, year={2018} }
Proactive-reactive scheduling is important in the situations where the project collaborators need to coordinate their efforts. The coordination is mostly achieved through the combination of the shared baseline schedule and the deviation penalties. In this paper, we present an extension of predictive Gantt chart to the proactive-reactive scheduling needs. It can be used to track the evolution of the relationship between dynamic and static elements through the time. The dynamic elements are…
6 Citations
Exact solving scheduling problems accelerated by graph neural networks
- Business, Computer Science2022 45th Jubilee International Convention on Information, Communication and Electronic Technology (MIPRO)
- 2022
This paper applies the graph convolutional neural network from the literature on speeding up general branch&bound solver by learning its branching decisions to the augmented solver, and discusses the interesting question of how much the authors can accelerate solving NP-hard problems in the light of the known limits and impossibility results in AI.
Explainability in reinforcement learning: perspective and position
- Computer ScienceArXiv
- 2022
This position paper attempts to give a systematic overview of existing methods in the explainable RL area and propose a novel unified taxonomy, building and expanding on the existing ones.
Explainable Artificial Intelligence: An Updated Perspective
- Computer Science2022 45th Jubilee International Convention on Information, Communication and Electronic Technology (MIPRO)
- 2022
This research offers an update on the current state of explainable AI (XAI), identifying new frontiers of research, explainability of reinforcement learning and graph neural networks, and gives a detailed overview of the field.
Modelling a project for the development of a neurocomputer interface based on EMG
- MedicineIOP Conference Series: Materials Science and Engineering
- 2020
The methods of recording the control signals of bionic devices based on the analysis of physiological and nervous processes in humans are reviewed and modeling of a project for developing a neurocomputer interface based on EMG using flexible methods of project management is modeled.
References
SHOWING 1-10 OF 16 REFERENCES
Proactive Reactive Scheduling in Resource Constrained Projects with Flexibility and Quality Robustness Requirements
- BusinessISCO
- 2014
A new model is proposed where, in each stage, reactive scheduling can adjust the baseline schedule to accommodate flexibility and quality requirements, based on bounded stochastic shortest path with finite state and action spaces.
Robust Project Scheduling
- BusinessFound. Trends Technol. Inf. Oper. Manag.
- 2010
This text focuses on robust project scheduling, in particular the development of effective and efficient proactive and reactive scheduling procedures, and discusses the fundamentals of state of the art proactive/reactive project scheduling approaches.
Proactive policies for the stochastic resource-constrained project scheduling problem
- Computer ScienceEur. J. Oper. Res.
- 2011
Robust and reactive project scheduling: a review and classification of procedures
- Business
- 2004
The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline…
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- BusinessJ. Sched.
- 2016
A new procedure for generating a proactive baseline schedule for the resource-constrained project scheduling problem is developed that is completely independent of the reactive policy applied, and outperforms two other published methods, assuming different robustness measures.
Project scheduling under uncertainty: Survey and research potentials
- Business, EngineeringEur. J. Oper. Res.
- 2005
Resource Constrained Project Scheduling under Uncertainty: A Survey
- Computer Science
- 2012
The survey of methods and models that are put into the historical context and are categorized according to their working principles are presented, which aims to supplement and update existing RCPSP surveys.
Simulation library for Resource Constrained Project Scheduling with uncertain activity durations
- Computer Science2014 37th International Convention on Information and Communication Technology, Electronics and Microelectronics (MIPRO)
- 2014
This paper describes the discrete-time simulation library aimed to support the creation of simulation-based algorithms for solving SRCPS problems with known probability distributions of activity durations and proposes modular organization of simulators that enables better reuse of basic intrinsic project scheduling functionality.
Stochastic scheduling problems I — General strategies
- MathematicsZ. Oper. Research
- 1984
The paper contains an introduction to recent developments in the theory of non-preemptive stochastic scheduling problems and focuses on the monotonicity behaviour of the model and the existence of optimal strategies.