This paper introduces load shed recovery actions for transmission networks by presenting the dc optimal load shed recovery with transmission switching model (DCOLSR-TS). The model seeks to reduce the amount of load shed, which may result due to transmission line and/or generator contingencies, by modifying the bulk power system topology. Since solving DCOLSR-TS is computationally difficult, the current work also develops a heuristic (MIP-H), which improves the system topology while specifying… CONTINUE READING
Highly Cited
This paper has 22 citations. REVIEW CITATIONS