Tidal power in Argentina

  • E.G. Alslks
  • Published 1993 in IEEE Power Engineering Review

Abstract

inaugurated on November 26,1966,following 25 years of design studies. Twenty-five years later, it is still the only industrial prototype of significant size. The development has provided much needed operating data to date. Frau is manager of the Operations Department, Hydraulic Generation Division, Electricite de France. Previous to this he was manager of… (More)

Topics

5 Figures and Tables

Slides referencing similar topics