Throughput and delay analysis of the IEEE 802.11e EDCA saturation

Abstract

In this paper, we introduce a simple model for the enhanced distributed channel access (EDCA) mechanism under saturation conditions. This model captures the operation of the AIFS (arbitration inter-frame space) and contention window differentiation of the EDCA mechanism. Using this model, we analyze the throughput and delay performance of EDCA. The results… (More)
DOI: 10.1109/ICC.2005.1495061

Topics

6 Figures and Tables

Statistics

051015'05'06'07'08'09'10'11'12'13'14'15'16'17'18
Citations per Year

62 Citations

Semantic Scholar estimates that this publication has 62 citations based on the available data.

See our FAQ for additional information.

Cite this paper

@article{Tantra2005ThroughputAD, title={Throughput and delay analysis of the IEEE 802.11e EDCA saturation}, author={Juki Wirawan Tantra and Chuan Heng Foh and Adel Ben Mnaouer}, journal={IEEE International Conference on Communications, 2005. ICC 2005. 2005}, year={2005}, volume={5}, pages={3450-3454 Vol. 5} }