Testing the Broadband Power Line communication for the Distribution grid management in a real operational environment

@article{Giustina2012TestingTB,
  title={Testing the Broadband Power Line communication for the Distribution grid management in a real operational environment},
  author={D. della Giustina and L. Andersson and C. Casirati and S. Zanini and L. Cremaschini},
  journal={International Symposium on Power Electronics Power Electronics, Electrical Drives, Automation and Motion},
  year={2012},
  pages={785-789}
}
  • D. della Giustina, L. Andersson, +2 authors L. Cremaschini
  • Published 2012
  • Engineering
  • International Symposium on Power Electronics Power Electronics, Electrical Drives, Automation and Motion
  • Distribution System Operators are working to improve and extend the level of control of their grid, as response to the new challenges of integrating distribution renewable sources and improving the quality of their service. In doing so, they need also to face up to the problem of reaching their transformer stations via a suitable communication technology, which can guarantee a balanced tradeoff between investments - in terms of cost and time for installation - and benefits - in term of… CONTINUE READING

    Figures and Tables from this paper.

    Experimental characterization of service latency over Broadband Power Line in Medium Voltage grid
    • 11
    Solutions to the Computer Networking Challenges of the Distribution Smart Grid
    • 26
    • Open Access
    Experimental performance characterization of a meshed network for the Smart Grid
    • 14

    References

    Publications referenced by this paper.
    SHOWING 1-10 OF 10 REFERENCES
    ICT architecture for an integrated distribution network monitoring
    • 13
    42/10 - regolazione della qualita dei servizi elettrici nel IV periodo di regolazione
    • 2012
    ARG/elt 333107 -testo integrato della regolazione della qual ita dei servizi di distribuzione, misura e vendita dell' energia elettrica per il periodo di regolazione 200S-2011
    • 2007
    Communications solutions product overview
      DCO 42/10 -regolazione della qualita dei servizi elettrici nel IV periodo di regolazione
      • 2010
      INTelligent Electrical GRId Sensor communications
        Open PLC european research alliance Available: http://www.ist -opera