Taming the Shrink-Swell Dragon

@inproceedings{Shinskey2005TamingTS,
  title={Taming the Shrink-Swell Dragon},
  author={F. G. Shinskey},
  year={2005}
}
After a thorough analysis, a control system upgrade provided the means to tame the shrink-swell dragon taking up residence in the steam generators of Maanshan II, a 950-MW pressurized-water reactor nuclear power plant in southern Taiwan. Maanshan II's design is complex, with three parallel steam generators, each with its own feedwater control system, and three feedwater pumps connected through a common header.