Supply planning for single-level assembly system with stochastic component delivery times and service level constraint

@inproceedings{Louly2008SupplyPF,
  title={Supply planning for single-level assembly system with stochastic component delivery times and service level constraint},
  author={Mohamed-Aly Louly and Alexandre Dolgui and Faicel Hnaien},
  year={2008}
}
2 Ecole des Mines de Saint Etienne Centre for Industrial Engineering and Computer Science 158 cours Fauriel, 42023 Saint Etienne Cedex 2, France e-mail: {dolgui, hnaien}@emse.fr times are random. A periodic “lot for lot” policy for component supply is studied. The decision variables are component planned lead times. The aim is to minimize the average holding cost for components while keeping a high customer service level for the finished product. When the lead times of the different types of… CONTINUE READING
Highly Cited
This paper has 34 citations. REVIEW CITATIONS

Citations

Publications citing this paper.
Showing 1-10 of 15 extracted citations

Optimal supply planning for two-levels assembly system with stochastic lead-times and maintenance actions

2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) • 2016
View 1 Excerpt

References

Publications referenced by this paper.
Showing 1-10 of 33 references

approvisionnement aléatoire en composants

A. Dolgui
Journal of Decision Systems, • 2001
View 4 Excerpts
Highly Influenced

Toward a Better Understanding of Lead Times in MRP Systems

J. J. Kanet
Journal of Operations Management, • 1986
View 4 Excerpts
Highly Influenced

Garcia-Sabater and F.C

J Mula, J.P.R. Poler
Lario • 2006

Inventory control of raw materials under stochastic and seasonal lead times

A. SilverE.
International Journal of Production Research • 2005

The detailed coordination problem in a two - level assembly system with stochastic lead times

O Tang, R. W. Grubbström
International Journal Production Economics • 2003
View 1 Excerpt

Newsboy model for supply planning of assembly systems

Louly M.A, A. Dolgui
International Journal of Production Research, • 2002

Optimal leadtimes planning in serial production systems with earliness

M. Elhafsi
2002
View 2 Excerpts

Similar Papers

Loading similar papers…