Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm

Abstract

Sorry, we couldn't extract an abstract for this paper.
DOI: 10.1016/j.eswa.2011.09.062

Topics

Figures and Tables

Sorry, we couldn't extract any figures or tables for this paper.

Slides referencing similar topics