Single-machine scheduling against due dates with past-sequence-dependent setup times

Abstract

Recently Koulamas and Kyparisis (2006) introduced past-sequence-dependent setup times to scheduling problems. This means that the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. Koulamas and Kyparisis (2006) were able to show for a number of single-machine scheduling problems with completion time goals that… (More)