Simulation-based, optimized scheduling of limited bar-benders over multiple building sites

Abstract

In the construction industry, a specialist subcontractor manages a taskforce of single-skilled laborers to work on multiple construction sites, aiming to minimize the total cost and stay profitable and competitive. This paper presents a simulation-based approach to assist the subcontractor in scheduling the application of limited laborer resources to handle… (More)

Topics

8 Figures and Tables

Cite this paper

@article{Lam2008SimulationbasedOS, title={Simulation-based, optimized scheduling of limited bar-benders over multiple building sites}, author={Hoi-Ching Lam and Ming Lu}, journal={2008 Winter Simulation Conference}, year={2008}, pages={2353-2360} }