Scheduling Aircraft Landings to Closely Spaced Parallel Runways

Abstract

An optimization model for a scheduling problem for closely spaced parallel approaches has been formulated. It takes temporal, pairing, sequencing, separation route and grouping constraints into account. Simulations investigated possible advantages of advanced scheduling methods over first-come-firstserved scheduling. Also, this study evaluated the… (More)

Topics

12 Figures and Tables