Saving Computer Resources with Dual-Rate Switching in Integrated Control and Scheduling

Abstract

Integrated control and scheduling is a problem where the control tasks are concurrent for the computer resources and appear the necessity of use the real-time scheduling algorithm to bound the delay and jitter where have impact of the control performance in control loops, when there is the CPU (central processing unit) overload. In case of the low CPU… (More)

7 Figures and Tables

Cite this paper

@article{Pinho2006SavingCR, title={Saving Computer Resources with Dual-Rate Switching in Integrated Control and Scheduling}, author={R. G. Pinho and M. M. Santos and M. Corr{\^e}a}, journal={2006 IEEE International Conference on Industrial Technology}, year={2006}, pages={1937-1942} }