Reverse logistics processes of multi-type end-of-life buildings / construction sites : An integrated optimization framework

A significant problem that has emerged in the field of construction and demolition waste management (C&D), involves the integrated optimization of the entire C&D waste supply chain. The critical decisions to be made include among others: (i) the determination of the optimal deconstruction depth for each EOL construction site before the demolition process… (More)