Production Rate Determination for Linear Construction Projects Based on Linear Scheduling Method

@inproceedings{Liu2016ProductionRD,
  title={Production Rate Determination for Linear Construction Projects Based on Linear Scheduling Method},
  author={Liqiang Liu and Yisheng Liu and Yuanjie Tang},
  year={2016}
}
Traditional scheduling methods such as CPM or PERT have been found to be inappropriate for scheduling the linear construction projects. According to the limitations of Traditional scheduling methods, Linear Scheduling Method (LSM) is proposed specifically for linear construction projects. Aiming at overcoming the limitations of network technology in deciding the production rate of linear construction projects, basing on LSM with its mathematical principle, this paper proposes a new method to… CONTINUE READING