Power transfer capacity improvements of existing overhead line systems

Abstract

The increased demand for power transfer in combination with environmental and economic issues which set constraints to building new lines, force the implementation of new technologies into the existing system in order to improve its power capability. Such methods involve re-tensioning, re-conductoring, or modifying the tower design to utilize composite… (More)

8 Figures and Tables

Topics

  • Presentations referencing similar topics