Power and delay analysis of 4:2 compressor cells

Abstract

Several low power and high speed 4:2 compressor designs of various digital logic styles are studied in this paper. HSPICE simulation results are provided giving a clear picture of the performance of these circuits in terms of power dissipation and delay. To carry out the analysis, a methodology for proper power measurement of pass-logic circuits has been… (More)
DOI: 10.1109/ISCAS.2005.1465398

Topics

7 Figures and Tables

Slides referencing similar topics