Physics verification program, Part III, Task 9. Quarterly technical report, July--September 1973

@inproceedings{Webb1974PhysicsVP,
  title={Physics verification program, Part III, Task 9. Quarterly technical report, July--September 1973},
  author={Harold W. Webb and M. N. Baldwin},
  year={1974}
}
In experimental Task 9, the fission rate in low-enriched UO/sub 2/ fuel pins and the neutron absorption rate in the boron of a simulated lumped burnable poison (LBP) material in a critical assembly are being measured. These rates are being compared for a few select core positions and for two types of LBP pins. (auth)