Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times

@article{Zhao2006PerformanceAA,
  title={Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times},
  author={Yao Zhao and David Simchi-Levi},
  journal={Operations Research},
  year={2006},
  volume={54},
  pages={706-724}
}
We consider the multiproduct and multicomponent assemble-to-order (ATO) systems where the replenishment lead times of the components are stochastic, sequential, and independent of the system state. The component inventories are either controlled by the continuous-time base-stock policies, namely, a base-stock ATO system, or by the continuous-time batchordering policies, namely, a batch-ordering ATO system. This paper develops the following results: First, for a base-stock ATO system with a… CONTINUE READING
Highly Cited
This paper has 46 citations. REVIEW CITATIONS

Citations

Publications citing this paper.
Showing 1-10 of 25 extracted citations

References

Publications referenced by this paper.
Showing 1-10 of 36 references

A note on assemble-to-order systems with batch ordering

  • J. S. Song
  • Management Sci. 46 739–743.
  • 2000
Highly Influential
13 Excerpts

The greatest of a finite set of random variables

  • C. E. Clark
  • Oper. Res. 9 145–162.
  • 1961
Highly Influential
9 Excerpts

Modeling and Analysis of Stochastic Systems

  • V. G. Kulkarni
  • Chapman and Hall, New York.
  • 1995
Highly Influential
3 Excerpts

Continuous review policies for multi-level inventory systems with stochastic demand

  • S. Axsater
  • S. Graves, A. Rinnooy Kan, P. Zipkin, eds…
  • 1993
Highly Influential
4 Excerpts

Queueing Systems, Vol

  • L. Kleinrock
  • 1: Theory. John Wiley and Sons, New York.
  • 1975
Highly Influential
3 Excerpts

Similar Papers

Loading similar papers…