Pb Injector at CERN

@inproceedings{Haseroth1996PbIA,
  title={Pb Injector at CERN},
  author={H. D. Haseroth},
  year={1996}
}
For the CERN Lead Ion Accelerating Facility (achieved within a collaboration of several outside laboratories and with financial help of some member states) a new dedicated Linac has been built. This Linac has been installed in 1994 and served during two extended physics runs. This paper reviews the main characteristics of this machine and describes the first operational experience. Emphasis is put on new features of this accelerator, its associated equipment and on the peculiarities of heavy… CONTINUE READING

Figures and Tables from this paper.

References

Publications referenced by this paper.
SHOWING 1-6 OF 6 REFERENCES

The CERN Heavy Ion Accelerating Facility

VIEW 1 EXCERPT

H.Umstätter, " Measured Performances of the LEBT of the Heavy Ion Linac of the CERN Lead Ion Facility

  • A. Lombardi, A. Pisent, +3 authors E Tanke
  • Proc. of the 1994 International Linac Conf., Tsukuba
  • 1994
VIEW 1 EXCERPT

Vretenar, "Construction and Commissioning Experience with the RFQ of the Heavy Ion Linac of the CERN Lead Ion Facility

  • A. Bezzon, A. Lombardi, +4 authors M. G. Parisi
  • Proc. of the 1994 International Linac Conf., Tsukuba
  • 1994
VIEW 1 EXCERPT

Vretenar, "The Matching Line between the RFQ and the IH of the Heavy Ion Linac of the CERN Lead Ion Facility

  • A. Facco, A. Lombardi, +3 authors M. W. Pirkl
  • Proc. of the 1994 International Linac Conf., Tsukuba
  • 1994
VIEW 1 EXCERPT

Warner, for the Linac 3 Running In Team, “The Heavy Ion Linac for the CERN Lead Ion Facility

  • D J.
  • Proc. of the 1994 International Linac Conf., Tsukuba
  • 1994
VIEW 1 EXCERPT