Partial discharge measurements and IEC standards: Justification of the use for their inclusion in afterlaying test for extruded cable systems

@article{Batalovix01072016PartialDM,
  title={Partial discharge measurements and IEC standards: Justification of the use for their inclusion in afterlaying test for extruded cable systems},
  author={Mirza Batalovix0107 and Dejan Bex0161lija and Mirsad Kapetanovix0107 and M. Mehdi. C. H. Kim and Kyong-Hoe Kim},
  journal={2016 IEEE International Power Modulator and High Voltage Conference (IPMHVC)},
  year={2016},
  pages={250-255}
}
Partial discharges, as their name states, only partially bridge a small portion of electrical insulation in the form of a tiny electrical arcs, which burn inside the defects that could appear in insulation system. Because of the fact that extruded cable system insulation is very sensitive on partial discharge activities detection vise, partial discharge measurements could be used as a powerful diagnostic tool in evaluating the actual condition of cable system through measuring procedures during… CONTINUE READING