    The PAC agrees with the plan to divide the Run 5 beamtime roughly equally between heavy ions, colliding Cu+Cu, and polarized protons. There was a consensus within the PAC that a 8-10 week pp run at s ½ = 200 GeV should have the highest priority and must not become the victim of possibly difficult budgetary boundary conditions. A brief polarized pp run at… (More)