Outline of the 100 kW OTEC Pilot Plant in the Republic of Nauru

@article{Mitsui1983OutlineOT,
  title={Outline of the 100 kW OTEC Pilot Plant in the Republic of Nauru},
  author={T. Mitsui and Fumio Ito and Y. Seya and Yasunobu Nakamoto},
  journal={IEEE Power Engineering Review},
  year={1983},
  volume={PER-3},
  pages={47-48}
}
  • T. Mitsui, Fumio Ito, +1 author Yasunobu Nakamoto
  • Published 1983
  • Engineering
  • IEEE Power Engineering Review
  • A 100 kW OTEC pilot plant was constructed for demonstration purposes in the Republic of Nauru and began, in October 1981, to send electricity to the real power system. The main points of the plan, design and technical considerations are introduced as well as the operation results up to date. This pilot plant operation has proved the validity of the electrical and mechanical design, and the underwater pipeline laying method in the field of ocean-civil engineering. 
    21 Citations

    Figures from this paper

    An application of OTEC principle to thermal power plant as a co-generation plant
    The advanced steam and gas technology
    • 3
    Analysis of external influences on an OTEC cycle
    • 4
    • Highly Influenced
    Experimental studies on a closed cycle demonstration OTEC plant working on small temperature difference
    • 35
    • Highly Influenced
    • PDF