Optimizing short-term plume containment: comparison of well arrangements

Abstract

Three well configurations were compared in terms of term ground-water contaminant plume containment. include parallel, octagonal and combination systems. system had three extraction wells upqradient and injection wells downgradient of the contaminant plume. shortThese Each three For each system, optimal pumping values and resulting potentiometric surface smoothness were computed for a hypothetical plume. Tested models utilized linear programming optimization and simulation via the response matrix method. The octagonal well configuration required less pumping for a pumping period of 8 days, than did the parallel or combination systems. The octagonal configuration resulted in the smoothest potentiometric surface, in terms of difference in final head at observation wells compared with those at the contaminant source.

2 Figures and Tables

Cite this paper

@inproceedings{Suguino2017OptimizingSP, title={Optimizing short-term plume containment: comparison of well arrangements}, author={Herminio H. Suguino and Richard C. Peralta and HERMINIO H. SUGUIN}, year={2017} }