Optimization of asset management in high voltage substation based on equipment monitoring and power system operation

@article{Suzuki2010OptimizationOA,
  title={Optimization of asset management in high voltage substation based on equipment monitoring and power system operation},
  author={Yotaro Suzuki and Hiroki Kojima and Naoki Hayakawa and Fumihiro Endo and Hitoshi Okubo},
  journal={2010 IEEE International Symposium on Electrical Insulation},
  year={2010},
  pages={1-5}
}
This paper presents a new optimization approach of maintenance strategy for equipment in a transmission and distribution (T&D) system. In this approach, a present and future equipment performance is estimated by using monitoring data, and impacts of performance in each equipment on a whole T&D system are evaluated. By minimizing the impacts, suitable maintenance procedures and timing are derived. This approach is applied to a circuit breaker (CB) in an electric network, and its significance and… CONTINUE READING

References

Publications referenced by this paper.
Showing 1-10 of 17 references

Optimization of asset maintenance strategies and power flow operation based on condition diagnoses

  • F. Endo
  • ISH,
  • 2009
1 Excerpt

Optimized asset management of high voltage substations and power network operation based on equipment performance

  • F. Endo
  • Cigre 6 Southern Africa Regional Conference,
  • 2009
1 Excerpt

New asset management practices for T&D utilities within deregulated power markets

  • D. G. Pérez, G. L. Hurtado, M. A. del Rey López de la Torre
  • CIGRE, B3-105,
  • 2008
1 Excerpt

Application of equipment diagnoses to operation and management planning of power grid

  • F. Endo
  • ISH,
  • 2007
1 Excerpt

Reliability centered asset management in distribution networks – Process and application examples

  • M. Schwan, K. Schilling, A. A. de Melo
  • CIRED, No
  • 2007
1 Excerpt

Reliability centered asset management in distribution networks – Process and application examples ” , CIRED , No

  • K. Schilling M. Schwan, A. A. de Melo
  • 2007

Selection of an optimal maintenance and replacement strategy of H . V . equipment by a risk assessment process ”

  • G. Balzer
  • 2006

Similar Papers