Optimization of Scheduling in FMS using Heuristic Approaches: A Case Study

@inproceedings{Devi2018OptimizationOS,
  title={Optimization of Scheduling in FMS using Heuristic Approaches: A Case Study},
  author={Gayatri Devi and Abhishek Agrahari and Gaganpreet Kaur},
  year={2018}
}
The flow shop scheduling problems are experiencing a huge eminence in this modern era of industrialization. In the present scenario we find almost every industry to be focusing prominently on the scheduling of the machines working in them, as it is a significant factor in deciding the net productivity. Nowadays almost each and every manufactur system is involved in following a preplanned schedule of machine operation considering the demand criterion put forth. Flexible manufacturing system… CONTINUE READING

References

Publications referenced by this paper.
SHOWING 1-10 OF 17 REFERENCES

Due-date assignment on uniform machines

  • European Journal of Operational Research
  • 2009
VIEW 1 EXCERPT

Performance measurement of selected heuristics algorithm for solving scheduling problems

V. Modrak, P. Semanco, W. Kulpa
  • European Journal of Operational Research,
  • 2009
VIEW 1 EXCERPT

Stochastic scheduling to minimize expected maximum lateness

  • European Journal of Operational Research
  • 2008
VIEW 1 EXCERPT