On two single machine scheduling problems with fuzzy processing times and fuzzy due dates

@article{Chanas2003OnTS,
  title={On two single machine scheduling problems with fuzzy processing times and fuzzy due dates},
  author={Stefan Chanas and Adam Kasperski},
  journal={European Journal of Operational Research},
  year={2003},
  volume={147},
  pages={281-296}
}
Two single machine scheduling problems with fuzzy processing times and fuzzy due dates are considered. In both we define the fuzzy tardiness of a job in a given sequence as a fuzzy maximum of zero and the difference between the fuzzy completion time and the fuzzy due date of this job. In the first problem we minimize the maximal expected value of a fuzzy tardiness and in the second we minimize the expected value of a maximal fuzzy tardiness. The problems look similar but we show that they have… CONTINUE READING

Citations

Publications citing this paper.
Showing 1-10 of 13 extracted citations

References

Publications referenced by this paper.
Showing 1-10 of 17 references

Scheduling Algorithms, Second Revised and Enlarged Edition

  • P. Brucker
  • 1998
Highly Influential
3 Excerpts

Single machine scheduling with fuzzy due dates, Seventh IFSA World Congress

  • K. Tanaka, M. Vlach
  • 1997
1 Excerpt

Single machine scheduling problem with fuzzy precedence relation

  • H. Ishii, M. Tada
  • European Journal of Operational Research
  • 1995
1 Excerpt

One machine scheduling problem with fuzzy duedates

  • S. Han, H. Ishii, S. Fujii
  • European Journal of Operational Research
  • 1994
1 Excerpt

Ranking fuzzy numbers with integral value

  • Liou, T.L, M. J. Wang
  • Fuzzy Sets and Systems
  • 1992
1 Excerpt

Similar Papers

Loading similar papers…