On optimal batch sizing in a multi-stage production system with rework consideration

Abstract

Recently, Sarker et al. [Sarker, B.R., Jamal, A.M.M., Mondal, S., 2008. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184(3) 915– 929] presented an EPQ inventory model for a multi-stage manufacturing system with rework process; basically they proposed two operational inventory… (More)
DOI: 10.1016/j.ejor.2008.04.015

Topics

7 Figures and Tables

Slides referencing similar topics