Nominal and robust train timetabling problems

@article{Cacchiani2012NominalAR,
  title={Nominal and robust train timetabling problems},
  author={Valentina Cacchiani and Paolo Toth},
  journal={European Journal of Operational Research},
  year={2012},
  volume={219},
  pages={727-737}
}
0377-2217/$ see front matter 2011 Elsevier B.V. A doi:10.1016/j.ejor.2011.11.003 ⇑ Corresponding author. E-mail addresses: valentina.cacchiani@unibo.it (V. it (P. Toth). In this paper we survey the main studies dealing with the train timetabling problem in its nominal and robust versions. Roughly speaking, the nominal version of the problem amounts of determining ‘‘good’’ timetables for a set of trains (on a railway network or on a single one-way line), satisfying the so-called track capacity… CONTINUE READING
Highly Cited
This paper has 106 citations. REVIEW CITATIONS

From This Paper

Topics from this paper.
61 Citations
46 References
Similar Papers

Citations

Publications citing this paper.
Showing 1-10 of 61 extracted citations

106 Citations

0102030'13'15'17
Citations per Year
Semantic Scholar estimates that this publication has 106 citations based on the available data.

See our FAQ for additional information.

References

Publications referenced by this paper.
Showing 1-10 of 46 references

A constraint generation algorithm for the construction of periodic railway timetables

  • M. Odijk
  • Transportation Research Part B
  • 1996
Highly Influential
19 Excerpts

Cyclic Railway Timetable Optimization, Ph.D Thesis, Erasmus Research Institute of Management, Erasmus

  • L.W.P. Peeters
  • 2003
Highly Influential
6 Excerpts

A cycle based optimization model for the cyclic railway timetabling

  • L.W.P. Peeters, L. G. Kroon
  • Lecture Notes in Economics and Mathematical…
  • 2001
Highly Influential
4 Excerpts

A Branch-and-cut Approach for Periodic Network Programming

  • K. Nachtigall
  • Technical Report 29, Hildesheimer Informatik…
  • 1994
Highly Influential
6 Excerpts

Railway track allocation: Models and methods, OR Spectrum (2010), doi:10.1007/s00291-009-0189-0

  • R. M. Lusby, J. Larsenz, M. Ehrgott, D. Ryan
  • European Journal of Operational Research
  • 2012
2 Excerpts

Scheduling extra freight trains on railway networks

  • V. Cacchiani, A. Caprara, P. Toth
  • Transportation Research Part B
  • 2010

Scheduling extra freight trains on railway networks, Transportation Research Part B

  • V. Cacchiani, A. Caprara, P. Toth
  • 2010
2 Excerpts

Similar Papers

Loading similar papers…