New benchmark results for the stochastic resource-constrained project scheduling problem

@article{Leus2015NewBR,
  title={New benchmark results for the stochastic resource-constrained project scheduling problem},
  author={Roel Leus and Salim Rostami and Stefan Creemers},
  journal={2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)},
  year={2015},
  pages={204-208}
}
In this article* we study the stochastic resource-constrained project scheduling problem or SRCPSP, where project activities have stochastic durations. A solution is a scheduling policy, and we propose a new class of policies that is a superset of most of the existing classes that are available in the literature. A policy in this new class makes a number of a-priori decisions in a pre-processing phase while the remaining scheduling decisions are made on-line. A two-phase local-search algorithm… CONTINUE READING
18 Citations
21 References
Similar Papers

Citations

Publications citing this paper.
Showing 1-10 of 18 extracted citations

References

Publications referenced by this paper.
Showing 1-10 of 21 references

R

  • B. Ashtiani
  • Leus and M. Aryanezhad, “New competitive results…
  • 2011
Highly Influential
7 Excerpts

Cost-dependent essential systems of ES-strategies for stochastic scheduling problems,

  • F. J. Radermacher
  • Methods of Operations Research,
  • 1981
Highly Influential
4 Excerpts

New benchmark results for the Stochastic Resource Constrained Project Scheduling (SRCPSP),” Thesis for obtaining the degree of Master of Advanced Business Studies

  • S. Rostami
  • 2013
2 Excerpts

The use of buffers in project management: The trade-off between stability and makespan,

  • S. Van de Vonder, E. Demeulemeester, W. Herroelen, R. Leus
  • International Journal of Production Economics,
  • 2005
1 Excerpt

Similar Papers

Loading similar papers…