Multi-objective Optimization for Integrated Production Scheduling and Maintenance Planning with Lorenz Non-dominated Genetic Algorithm

@inproceedings{Shijin2012MultiobjectiveOF,
  title={Multi-objective Optimization for Integrated Production Scheduling and Maintenance Planning with Lorenz Non-dominated Genetic Algorithm},
  author={Wang Shi-jin},
  year={2012}
}
A multi-objective optimization problem for integrated production scheduling and preventive maintenance planning in a single machine environment is investigated in this paper.The time to failure(repair)of the machine is subject to an exponential distribution.The sequence-dependent setup times are also considered into the problem,which can be processed with preventive maintenance activities simultaneously.The job processing is non-preemptive with preventive maintenance activity.The objectives are… CONTINUE READING