Modified exergoeconomic modeling of geothermal power plants

@inproceedings{Cokun2011ModifiedEM,
  title={Modified exergoeconomic modeling of geothermal power plants},
  author={Can Coşkun and Zuhal Oktay and Ibrahim Dincer},
  year={2011}
}
In this study, a modified exergoeconomic model is proposed for geothermal power plants using exergy and cost accounting analyses, and a case study is in this regard presented for the Tuzla geothermal power plant system (Tuzla GPPS) in Turkey to illustrate an application of the currently modified exergoeconomic model. Tuzla GPPS has a total installed capacity of 7.5 MW and was recently put into operation. Electricity is generated using a binary cycle. In the analysis, the actual system data are… CONTINUE READING

Citations

Publications citing this paper.
SHOWING 1-9 OF 9 CITATIONS