Maintenance Staff Scheduling at Afam Power Station

@inproceedings{Alfares2007MaintenanceSS,
  title={Maintenance Staff Scheduling at Afam Power Station},
  author={Hesham K. Alfares and M Lilly and Ikuobase Emovon},
  year={2007}
}
This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to… CONTINUE READING

References

Publications referenced by this paper.
Showing 1-10 of 14 references

Efficient optimization of cyclic labour daysoff scheduling

  • H. K. Alfares
  • 2001
Highly Influential
4 Excerpts

A stochastic programming model for scheduling maintenance

  • S. O. Duffuaa, K. S. Al-Sultan
  • 1999
2 Excerpts

A stochastic programming model for scheduling maintenance personnel

  • S. O. Duffuaa, K. S. Al-Sultan
  • Applied Mathematical Modelling
  • 1999
2 Excerpts

Staffing a multiskilled workforce with varying levels of productivity : An analysis of cross - training policies

  • M. J. Brusco, T. R. Johns
  • Decision Sciences
  • 1998
1 Excerpt

Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training

  • M. J. Brusco, T. R. Johns
  • Power Engineering,
  • 1998
1 Excerpt

Similar Papers

Loading similar papers…