Integrated optimisation of facilities layout and material handling system

The existing methodologies to independently optimise facilities layout design and material handling system (MHS) are mainly based on minimising the material handling cost and acquisition cost and have neglected several critical variations inherent in a manufacturing system. This is despite the fact that the inherent variability causes an accumulation of… (More)