Integrated Scheduling of Ladder layout design in Flexible Manufacturing System using Non-Traditional optimization techniques

@article{Mallikarjuna2017IntegratedSO,
  title={Integrated Scheduling of Ladder layout design in Flexible Manufacturing System using Non-Traditional optimization techniques},
  author={K. Mallikarjuna and K. H. Reddy and N. G. Rao and V. Veeranna},
  journal={Materials Today: Proceedings},
  year={2017},
  volume={4},
  pages={8069-8078}
}
  • K. Mallikarjuna, K. H. Reddy, +1 author V. Veeranna
  • Published 2017
  • Engineering
  • Materials Today: Proceedings
  • Abstract The Ladder layout design (LLD) problem generally crop ups when a manufacturing cluster intended to enlarge their making capacity and/or decrease the transportation cost or material flow through a predefined sequence of machines for manufacturing a product. The problem is known to be Non-deterministic Polynomial (NP) hard, which is usually solved by metaheuristics. In this paper, multi-objective optimization is considered related to FMS scheduling which acts as a constraint in… CONTINUE READING
    2 Citations