Hydro power equivalents of complex river systems


When a hydro power producer wants to plan the production for the next day in an optimal way a precise and detailed model is needed. But when using this model to plan for a longer period of time the computational complexity increases. To overcome this problem there is a need to do a model reduction of the original system into a smaller equivalent system with… (More)


11 Figures and Tables