Evacuation of power from Tehri HPP stage – I

@inproceedings{Kothari2007EvacuationOP,
  title={Evacuation of power from Tehri HPP stage – I},
  author={Hiten M. Kothari and P. K. Srivastava and Nitin Kumar},
  year={2007}
}
The salient features of the Power Evacuation arrangement from 4x250 MW Tehri HPP Stage-I have been described in the paper. The beneficiary States/Union territory gets power through Meerut Sub- Station from 220 kV lines of Power Grid Corporation of India Limited (PGCIL) net work.