Estimating the Cost of Throttled Execution in Time Warp

  • Samir Ranjan Das
  • Published 1996 in Workshop on Parallel and Distributed Simulation

Abstract

Over-optimistic execution has long been identified as a major performance bottleneck in Time Warp based parallel simulation systems. An appropriate throttle or control of optimism can improve performance by reducing the number of rollbacks. However, the design of an appropriate throttle is a difficult task, as correct computations on the critical path may… (More)
DOI: 10.1145/238788.238844

Topics

2 Figures and Tables

Cite this paper

@inproceedings{Das1996EstimatingTC, title={Estimating the Cost of Throttled Execution in Time Warp}, author={Samir Ranjan Das}, booktitle={Workshop on Parallel and Distributed Simulation}, year={1996} }